A large Brazilian condominium successfully implemented a phased EV charging project. This case study presents their replicable model. It provides a practical guide for property managers, boards, and residents. The project began by evaluating various Solutions de recharge pour véhicules électriques, including options from Fabricants de chargeurs de VE like TPSON and even considering chargeurs ev portables for initial flexibility. This process established a clear path for initial assessment, phased implementation of each Chargeur de VE, and sustainable cost management, creating a valuable blueprint for other residential communities.

Phase 1: Initial Assessment and Planning

Phase 1: Initial Assessment and Planning
Case Study: A Phased Rollout of EV Charging in a Large Brazilian Condomínio 6

A successful project begins with a solid foundation. The condominium board initiated Phase 1 by conducting a thorough assessment. This data-driven approach ensured that every decision was strategic, informed, and aligned with both current needs and future growth.

Identifying the Need

Designing the Resident Survey

The board first created a digital survey to measure resident interest. The survey asked simple questions: Did residents currently own an EV? Were they planning to purchase one in the next 1-3 years? What were their expectations for on-site charging? This initial step provided a clear baseline of immediate demand.

Analyzing Survey Results

Survey results showed a small but dedicated group of current EV owners. A much larger group indicated plans to purchase an EV within two years. This data confirmed that a proactive approach was necessary. The board understood that failing to act would soon leave residents without a crucial amenity.

Forecasting Future Demand

The board looked beyond simple survey data to forecast long-term needs. They used several professional methods to create a robust prediction model.

  • Local EV Uptake: They analyzed the growth of EV ownership in their city and neighborhood. This helped predict the increasing need for residential charging solutions.
  • Probabilistic Framework: The board also considered a more advanced model. This method used historical EV registration data, government mandates, and local census information to project future adoption rates within the building’s specific profile.

Technical Feasibility Study

Evaluating Existing Electrical Capacity

An electrical engineer evaluated the condominium’s main power panel and distribution system. The initial assessment revealed that the existing infrastructure could support a small number of chargers. However, a large-scale rollout would require significant upgrades.

Assessing Grid Connection and Limitations

The board contacted the local utility provider to understand the building’s grid connection limits. This conversation was critical. It clarified how much additional power they could draw without needing a costly transformer upgrade from the utility company.

Mapping Physical Space for Chargers

The property manager mapped potential locations for chargers. They identified spots in the common garage area for a pilot program. They also planned routes for conduits to individual parking spaces for future installations.

Identifying Structural Constraints

The team inspected the garage for any structural challenges. They checked wall integrity for mounting hardware and assessed ceiling heights for running new electrical conduits. This step prevented unexpected construction delays and costs later in the project.

Navigating Brazilian Regulations

Understanding ANEEL Normative Resolution 1,000

Navigating Brazil’s regulatory landscape was a key task. The board’s legal advisor reviewed ANEEL Normative Resolution 1,000, which governs EV charging in shared living spaces.

Key Takeaways from ANEEL Resolution 1,000:

  1. Condominiums must permit residents to install individual chargers if they meet technical and safety standards.
  2. Residents are responsible for the costs of their private charging stations.
  3. Electricity can be billed individually via separate meters or collectively based on usage.
  4. The condominium should create clear rules for installation and use to ensure fairness.

Securing Local Municipal Permits

The board confirmed with the local municipality that their planned electrical upgrades and charger installations would require specific permits. They started the application process early to avoid delays.

Researching Utility Company Rules (Enel, CPFL, Light S.A.)

Each utility company in Brazil (like Enel, CPFL, or Light S.A.) has its own rules for connecting new high-load equipment. The board studied their specific provider’s technical requirements for EV charging infrastructure to ensure full compliance.

Exploring Federal and State Incentives

Finally, the board researched available government incentives. They investigated potential tax benefits or grants for installing energy-efficient technologies, which helped shape the financial model for the project.

Financial Modeling for EV Charging

With a clear understanding of the technical and regulatory requirements, the board developed a comprehensive financial model. This step was crucial for ensuring the project’s long-term sustainability and securing resident buy-in.

Estimating Hardware and Installation Costs

The financial committee began by gathering quotes for all physical components. They evaluated technologically advanced solutions from various providers, including TPSON, to understand the range of available features and price points. The total capital expenditure (CAPEX) was broken down into clear categories.

Élément de coûtDescriptionEstimated Impact
Stations de rechargeCost of AC Level 2 smart chargers for the pilot program.Modéré
Electrical LaborCertified electrician fees for installation and panel work.Haut
MatérielsConduits, wiring, breakers, and mounting hardware.Modéré
Frais de permisMunicipal and engineering approval costs.Faible

This detailed breakdown helped the board understand that installation labor, not just the hardware, represented a significant portion of the initial investment.

Projecting Software and Network Fees

The board chose smart chargers, which required ongoing software subscriptions. These recurring operational expenditures (OPEX) were essential for managing the EV charging network effectively. The projected monthly fees covered several critical functions:

  • User authentication and access control
  • Automated billing and payment processing
  • Load management to prevent overloading the building’s grid
  • Surveillance et diagnostic à distance

Ces frais logiciels ont été intégrés au modèle de récupération des coûts pour garantir l'autofinancement du système sur le long terme.

Comparaison des modes de financement : Fonds du condominium vs. Contribution spéciale

Le conseil a présenté aux résidents deux options de financement principales pour l'investissement initial en infrastructure. Chaque option présentait des avantages et des inconvénients distincts.

Considération clé : Le conseil a recommandé une approche hybride. Il a proposé d'utiliser une partie du fonds de réserve du condominium pour démontrer son engagement, puis de lever une contribution spéciale modérée pour couvrir le solde restant. Ce modèle de responsabilité partagée s'est avéré plus acceptable pour les résidents.

La première option consistait à utiliser le fonds de réserve général (fonds de réserve). La deuxième option était une contribution spéciale (contribution spéciale) facturée à toutes les unités. Après de nombreux débats en assemblée générale, les résidents ont approuvé le modèle hybride. Évaluation des modèles d'opérateur tiers.

Dans le cadre de leur diligence raisonnable, le comité a également évalué un modèle d'opérateur tiers. Dans ce scénario, une entreprise externe installerait et exploiterait les bornes avec peu ou pas de coût initial pour le condominium. L'opérateur percevrait ensuite tous les revenus, en rétrocédant un faible pourcentage à la copropriété. Bien que ce modèle élimine l'investissement initial, le conseil l'a rejeté. Il souhaitait un contrôle total sur la tarification, l'expérience utilisateur et la capacité de réinvestir directement les revenus dans la maintenance et l'expansion future.

Phase 2 : Programme pilote et modernisation de l'infrastructure.

Une fois la planification terminée, le condominium est passé à la phase d'exécution. Cette phase s'est concentrée sur le lancement d'un programme pilote contrôlé pour tester le système en conditions réelles, tout en modernisant l'infrastructure électrique principale de l'immeuble pour une évolutivité future.

Mise en œuvre du programme pilote.

Sélection des emplacements du programme pilote

Le conseil a utilisé une approche basée sur les données

(approche axée sur les données) pour sélectionner les emplacements des premières bornes. Il a analysé les données de l'enquête auprès des résidents et les plans de l'immeuble pour identifier quatre emplacements stratégiques dans une zone commune très visible du garage. Ces emplacements ont été choisis car ils étaient proches du tableau électrique principal, ce qui a minimisé les coûts de câblage initiaux, et étaient facilement accessibles au premier groupe de propriétaires de véhicules électriques. Installation du premier jeu de bornes.

Un entrepreneur électricien certifié a installé quatre bornes de recharge intelligentes AC de niveau 2. L'installation a impliqué de tirer de nouvelles conduites depuis un sous-tableau jusqu'aux places de parking désignées et de fixer solidement les bornes. Les travaux ont été réalisés sur un week-end pour minimiser les perturbations pour les résidents.

Test de l'interface utilisateur et du système de paiement.

Avant la mise en service, le gestionnaire immobilier et quelques membres du conseil ont testé l'ensemble du parcours utilisateur. Ils ont téléchargé l'application mobile, créé des comptes, initié des sessions de recharge et effectué des paiements tests. Cette étape cruciale a permis d'identifier et de corriger des bogues logiciels mineurs, garantissant une expérience fluide pour les résidents dès le premier jour.

Collecte des premiers retours utilisateurs.

Le conseil a activement collecté les retours des utilisateurs pilotes. Il a suivi des

indicateurs clés de performance pour mesurer le succès et identifier les axes d'amélioration. Temps de disponibilité du système.

  • : Ils ont surveillé le pourcentage de temps pendant lequel les bornes étaient opérationnelles.Satisfaction des utilisateurs.
  • : Des enquêtes ont recueilli des retours sur la facilité d'utilisation et la fiabilité.Consommation d'énergie totale.
  • Consommation d'énergie: Le conseil a suivi le total des kWh consommés pour évaluer l'impact sur le réseau électrique de l'immeuble.
  • Données des sessions de recharge: Ils ont analysé la durée des sessions et les heures de pointe d'utilisation pour comprendre les habitudes de recharge.

Modernisation de l'infrastructure électrique principale de l'immeuble

Dimensionnement et modernisation du tableau principal

Un ingénieur électricien a déterminé que le tableau électrique principal nécessitait une modernisation pour soutenir la vision complète et à long terme de la recharge pour véhicules électriques. Le conseil a approuvé le projet d'installation d'un nouveau tableau de distribution principal de plus grande capacité, créant une base solide pour l'expansion future.

Installation de conduites et câblages dédiés

Pour se préparer à la demande future, le condominium a installé des “goulottes” ou conduites vides courant vers différentes sections du garage. Bien que plus coûteuse initialement, cette stratégie de pré-câblage a considérablement réduit le coût et la complexité de l'ajout ultérieur de nouvelles bornes.

Mise en œuvre de systèmes de gestion de charge

Le conseil a mis en œuvre un système de Gestion Dynamique de la Charge (GDC) pour éviter les surcharges électriques. Cette technologie intelligente agit comme un conducteur intelligent pour l'alimentation électrique de l'immeuble.

Un système GDC surveille en permanence la consommation électrique totale de l'immeuble. Il ajuste automatiquement et en temps réel la puissance envoyée à chaque borne de recharge pour VE. Si la consommation de l'immeuble augmente brusquement, le GDC réduit les vitesses de recharge pour maintenir la charge totale dans des limites sûres, évitant ainsi le déclenchement des disjoncteurs.

Conformité aux normes NBR 5410

Tous les travaux électriques ont strictement respecté la norme brésilienne NBR 5410 pour les installations électriques basse tension. Le conseil a engagé un ingénieur diplômé pour inspecter et certifier l'installation finale, garantissant ainsi la sécurité et la conformité de l'ensemble du système.

Choix de la technologie appropriée

Bornes AC de niveau 2 vs. Bornes DC rapides

Le conseil a évalué à la fois les bornes AC de niveau 2 et les bornes DC rapides. Pour un cadre résidentiel où les voitures stationnent toute la nuit, le choix était clair.

FonctionnalitéChargeur AC niveau 2Chargeur rapide DC
CoûtInvestissement initial plus faibleInvestissement initial très élevé
InstallationNécessite un circuit 240VNécessite des mises à niveau majeures du réseau
Vitesse de chargement4 à 10 heures pour une charge complète20 à 60 minutes pour une charge à 80%
Meilleur cas d'utilisationRecharge résidentielle nocturneAires de repos sur autoroute
Un diagramme à barres comparant les chargeurs AC Niveau 2 et les chargeurs DC rapides. Le graphique montre que les chargeurs DC rapides ont une puissance de sortie nettement supérieure et des temps de charge beaucoup plus rapides que les chargeurs AC Niveau 2.
Étude de cas : Déploiement par phases de la recharge pour VE dans un grand condominium brésilien 7

Les bornes AC de niveau 2 offraient le compromis idéal entre coût et identique en prix. vitesse pour les besoins du condominium.

Bornes intelligentes vs. Bornes “simples”

Le comité a choisi des bornes “intelligentes” plutôt que des bornes “simples” de base. Les bornes intelligentes se connectent à Internet, permettant des fonctionnalités essentielles comme la surveillance à distance, le contrôle d'accès et la facturation automatisée, qui étaient critiques pour gérer une ressource partagée dans un grand immeuble.

Sélection d'une plateforme logicielle de gestion

Le conseil a sélectionné une plateforme logicielle offrant un tableau de bord centralisé pour gérer l'ensemble du réseau. Les fonctionnalités clés comprenaient :

  • Streamlined management for monitoring all charging activities.
  • An intuitive mobile app for residents to schedule sessions and make payments.
  • Data analytics on energy usage and peak demand periods.

Hardware Vetting for Brazilian Climate

Finally, the board vetted hardware from several providers, including technologically advanced options from TPSON. They prioritized chargers with high IP (Ingress Protection) ratings to withstand the humidity and temperature fluctuations common in many parts of Brazil, ensuring long-term durability.

Phase 3: Scaled Rollout and Resident Onboarding

Phase 3: Scaled Rollout and Resident Onboarding
Case Study: A Phased Rollout of EV Charging in a Large Brazilian Condomínio 8

Following the successful pilot, the condominium began a full-scale expansion. This phase focused on systematically growing the network, onboarding all residents, and operationalizing the financial model to ensure long-term sustainability.

Expanding the Charging Network

Strategy for Adding Chargers to Common Areas

The board developed an agile expansion strategy based on data from the pilot program. This approach allowed them to respond effectively to growing demand and technological changes. Key actions included:

  • Expanding existing charging hubs with more chargepoints.
  • Identifying new common area locations using demand data and resident requests.
  • Continuously monitoring the network’s reliability and performance.
  • Collaborating with their utility provider to manage the increased electrical load.

Process for Dedicated Private Spot Installations

The condominium established a clear, standardized process for residents wanting a charger in their private parking spot. A resident would submit a formal request. The board’s approved contractor would then conduct a site survey. The resident covered the full cost of the hardware and installation, ensuring fairness for all.

Managing Waitlists and Prioritization

Demand for new chargers quickly outpaced the installation schedule. The board created a transparent digital waitlist. Priority was given based on the date of request. This first-come, first-served system was communicated clearly to all residents, managing expectations and preventing disputes.

Integrating New Chargers into the Network

Each new charger, whether in a common area or a private spot, was integrated into the central management software. This ensured every station, including technologically advanced units from providers like TPSON, operated under the same rules, billing system, and load management protocol.

Resident Communication and Onboarding

Developing a Communication Plan

Clear communication was paramount. The board understood that providing too much information was better than providing too little.

The communication plan outlined how the board would engage residents at every step. This proactive approach prevented information gaps and ensured residents felt included in the process. Consultation helped the board understand specific concerns and requirements.

Conducting Resident Training Workshops

The property manager hosted several training workshops. These sessions demonstrated how to use the mobile app, start a charging session, and understand the billing process. This hands-on training built resident confidence in the new EV charging system.

Creating a Digital Sign-Up Process

A simple digital sign-up form was created on the condominium’s resident portal. New users could register their vehicle, link a payment method, and gain access to the charging network within minutes.

Publishing Usage Rules and Etiquette

The board published a clear set of rules and etiquette guidelines. These rules covered topics like session time limits during peak hours, proper cable management, and the importance of moving a vehicle once charging is complete.

Billing and Cost Recovery in Action

Setting the Price per kWh

The board set the price per kilowatt-hour (kWh) slightly above the utility’s commercial rate. This small margin was designed to cover electricity costs, software fees, and future maintenance, making the system financially self-sufficient.

Implementing Idle Fees and Session Charges

To maximize charger availability, the board implemented an idle fee policy. This practice discourages drivers from leaving their cars parked in a spot after charging is complete. A small per-minute fee would begin 15 minutes after a session ended, ensuring the chargers were available for the next user.

Managing Revenue for O&M Costs

All revenue from charging sessions and idle fees was directed into a dedicated fund. This fund was used exclusively for operations and maintenance (O&M), including software subscriptions, network fees, and any necessary hardware repairs.

Monthly Reporting to Residents and Board

The board provided transparent monthly reports. These reports detailed total energy consumption, revenue collected, and operational costs. This transparency maintained resident trust and demonstrated the project’s financial health.

Results, Challenges, and Key Learnings

With the system fully operational, the condominium board began the crucial process of measuring success, analyzing challenges, and documenting key lessons. This final stage provided invaluable data, validating the project’s strategic approach and offering a clear roadmap for future improvements.

Measured Project Outcomes

The board tracked several key metrics to quantify the project’s impact. The results demonstrated clear success across adoption, usage, and financial performance.

Tracking Resident Adoption Rates

The board monitored the number of residents signing up for the charging service. Within the first six months of the full rollout, adoption exceeded initial forecasts by 25%. The digital sign-up process proved highly effective. The availability of a reliable on-site solution encouraged several residents to accelerate their EV purchase plans.

Analyzing Charger Usage Data and Peak Times

The management software provided a wealth of data on charger usage. Analysis revealed distinct patterns:

  • Peak Charging Hours: The highest demand occurred between 7:00 PM and 11:00 PM as residents returned home from work.
  • Session Duration: The average charging session lasted 4.5 hours, confirming that AC Level 2 chargers were perfectly suited for overnight use.
  • Weekend Usage: Usage spiked on weekends, particularly on Sunday evenings, as residents prepared for the week ahead.

This data allowed the property manager to optimize the idle fee policy and plan for future load management needs.

Calculating Financial Return on Investment (ROI)

The financial committee performed an initial ROI calculation one year after the full rollout. The revenue generated from charging sessions and idle fees successfully covered all operational costs, including electricity, software subscriptions, and a contribution to a dedicated maintenance fund. The project was on track to fully pay back the initial capital investment within the projected five-year timeframe.

Impact on Property Value and Desirability

The board consulted with local real estate professionals to assess the project’s impact. The feedback was overwhelmingly positive. Agents confirmed that an apartment without access to charge points will likely become ‘tricky to sell’ in the near future. The early adoption of this amenity enhanced tenant satisfaction and long-term property value, positioning the condominium as a modern and desirable place to live.

Challenges Encountered and Solutions

No project of this scale is without its difficulties. The board’s proactive and transparent approach was critical in navigating these challenges effectively.

Resolving Parking Spot Disputes

Initial friction arose over the use of common area chargers. Some residents treated the spots as preferential parking. The board addressed this by reinforcing the published etiquette rules and strictly enforcing the idle fee policy. This ensured the spots remained available for their intended purpose: charging vehicles.

Managing Grid Load During Peak Hours

During a summer heatwave, the combination of air conditioning and evening EV charging pushed the building’s electricity consumption near its limit. The Dynamic Load Management (DLM) system performed exactly as designed. It automatically and temporarily reduced charging speeds, preventing a blackout and demonstrating the value of investing in smart charging technology.

Navigating Installation and Supply Chain Delays

The project faced several delays common in large-scale retrofits. The board’s planning and documentation helped mitigate these issues.

Delay EncounteredHow the Condominium Responded
Legal BottlenecksThe board’s legal team created a standardized agreement for private installations, which streamlined the approval process for individual residents.
Power Supply LimitsEarly engagement with the utility company and the decision to upgrade the main panel prevented major capacity-related roadblocks during the scaled rollout.
Installer AvailabilityThe board vetted and pre-approved a list of certified installers, ensuring all work met NBR 5410 standards and preventing delays from unqualified labor.

Addressing Resident Skepticism

In the early stages, some residents questioned the project’s necessity and cost. The board countered this skepticism with a data-driven communication strategy.

Key Arguments That Won Support:

  • Financial Viability: They presented clear models showing how long-term savings in maintenance and “fuel” costs for residents made the system economically sound.
  • Successful Examples: The board shared case studies from other residential projects, proving the concept was reliable and beneficial.
  • La protection de l'avenir: They emphasized that advancements in battery technology would only increase EV adoption, making the infrastructure a necessary, not optional, amenity.

Resident Feedback and Satisfaction

Ultimately, the project’s success was measured by resident satisfaction. The board actively solicited feedback to gauge the community’s response and identify lessons for the future.

Post-Implementation Survey Results

A survey conducted one year after launch revealed high satisfaction rates. Over 95% of EV-owning residents rated the system as “good” or “excellent.” Non-EV owners also responded positively, with many noting that the project increased their confidence in the board’s forward-thinking management.

Collecting and Showcasing Resident Testimonials

The board collected positive testimonials and shared them in the condominium’s newsletter. Residents praised the convenience of overnight charging, the user-friendly mobile app, and the transparent billing system. These authentic endorsements helped build a strong sense of community pride in the project.

Lessons Learned for Future Phases

The entire process yielded valuable insights for the condominium’s ongoing energy strategy.

  • Start with Data: A resident survey is the essential first step.
  • Invest in a Scalable Backbone: Pre-installing conduits saves significant time and money later.
  • Communication is Non-Negotiable: A transparent, continuous communication plan prevents misinformation and builds trust.
  • Choose Smart Technology: Features like load management and remote monitoring are critical for long-term operational success, justifying the selection of advanced hardware from providers like TPSON.

This structured, phased approach transformed a complex challenge into a flagship amenity, setting a new standard for residential living in their community.


This case study demonstrates that a structured, data-driven approach is essential for a successful EV charging rollout. The condominium’s success rested on several key factors:

  • Starting with a controlled pilot program.
  • Methodically upgrading the electrical infrastructure.
  • Maintaining clear and constant resident communication.

This project serves as a viable blueprint for other Brazilian condominiums. Property managers and residents can use this model, supported by technologically advanced solutions from providers like TPSON, to confidently begin their own electrification journey.

FAQ

What is the first step for a condominium?

The board should first conduct a resident survey. This initial step measures current interest and forecasts future demand. The data provides a solid foundation for all subsequent planning and investment decisions, ensuring the project aligns with community needs.

Can a resident install a private charger?

Yes. Brazil’s ANEEL Resolution 1,000 allows residents to install chargers in their private parking spots. The condominium must establish clear technical and safety standards for these installations. The board’s approved contractor typically performs the work to ensure compliance.

Who pays for a dedicated private charger?

The resident requesting the charger is responsible for all associated costs. This includes the charging hardware, professional installation, and any necessary wiring from the main panel to their parking spot. This policy ensures fairness for all residents in the building.

Pourquoi les chargeurs intelligents sont-ils meilleurs que les chargeurs basiques ?

Les chargeurs intelligents offrent des fonctionnalités de gestion essentielles. Ils permettent la facturation automatisée, le contrôle d'accès des utilisateurs et la surveillance à distance. Plus important encore, ils prennent en charge la Gestion Dynamique de Charge (GDC) pour éviter la surcharge du système électrique du bâtiment pendant les heures de pointe. 🔌

Comment un bâtiment peut-il gérer une capacité électrique limitée ?

La copropriété doit engager un ingénieur pour évaluer le raccordement au réseau. Si nécessaire, le conseil peut approuver une mise à niveau du tableau électrique principal. La mise en œuvre d'un système de Gestion Dynamique de Charge (GDC) est également cruciale pour équilibrer efficacement la distribution d'énergie.

Comment la copropriété garantit-elle un accès équitable aux chargeurs partagés ?

Le conseil établit des règles d'utilisation claires et des lignes directrices de bon usage.

Pour décourager les utilisateurs d'occuper les places après la fin de la charge, le système applique des frais d'inactivité automatisés. Cette politique maximise la disponibilité des chargeurs pour tous les résidents qui ont besoin de recharger leur véhicule.

Quels sont les critères importants lors du choix du matériel de charge ?

Le conseil doit privilégier la durabilité et les performances. Il est judicieux de choisir un matériel avec des indices de protection (IP) élevés pour résister au climat brésilien. Les solutions technologiquement avancées de fournisseurs comme TPSON offrent la fiabilité et les fonctionnalités intelligentes nécessaires à la réussite d'un projet à long terme.

À propos de nous
Image de TPSON
TPSON

Chez TPSON, la sécurité, l'efficacité et la durabilité de l'énergie sont nos objectifs. Nous développons des technologies de pointe dans le domaine des solutions énergétiques et des systèmes électriques intelligents.

Prendre contact

Intéressé par nos solutions de recharge pour véhicules électriques ? Contactez notre équipe pour plus d'informations :
info@tpsonpower.com

OU