DIY vs. Professional Installation for Your Home Charging Box: A German Safety Guide

DIY vs. Professional Installation for Your Home Charging Box: A German Safety Guide
DIY vs. Professional Installation for Your Home Charging Box: A German Safety Guide 4

The debate over DIY vs. professional installation for home charging ends with German law. A professional must handle any work on a home’s fixed electric system. This legal requirement includes the installation of a wallbox for charging your electric car. Charging at home introduces high electrical loads, making safety a top priority. Research confirms that faulty wiring is a primary cause of system fires. This underscores the importance of quality work for the safety of your home and car. While Производители зарядных устройств для электромобилей такие как TPSON, обеспечивают передовую Решения для зарядки электромобилей, и портативные зарядные устройства offer flexibility, a permanent Зарядное устройство для электромобилей demands certified expertise for safe charging of your car at home.

Legal Note: Germany’s Low-Voltage Connection Ordinance (NAV § 13) explicitly states that only a registered electrical contractor may connect equipment to the low-voltage grid. This makes DIY wallbox installation illegal.

The Law in Germany: Why Professional Installation is Mandatory

German law leaves no room for interpretation regarding your home charging setup. The regulations are strict, specific, and designed to protect homeowners, their property, and the public power grid. A DIY approach is not just a bad idea; it is illegal. Understanding these laws reveals why a professional installation is the only acceptable path for safe зарядка электромобилей.

Understanding NAV § 13

The cornerstone of German electrical safety is the Low-Voltage Connection Ordinance, or Low-Voltage Connection Ordinance. Section 13 of this regulation is crystal clear.

What is the Low-Voltage Connection Ordinance?

This federal ordinance governs how all electrical systems connect to the public low-voltage grid. Its primary purpose is to ensure technical safety, prevent disruptions, and maintain a stable power supply for everyone. The law sets the technical rules and defines who is authorized to perform work on fixed electrical installations in a home. These guidelines are not optional.

The Role of the Registered Electrician

NAV § 13 mandates that only a registered electrical contractor may work on your home’s electrical system. This includes any modifications, extensions, or new connections. An electrician’s registration with the local grid operator directory proves they have the necessary qualifications, knowledge of local electrical codes, and liability insurance. They are the sole gatekeepers for safe grid connection.

Rules for Connecting to the Public Grid

Connecting charging equipment involves more than just wiring. The electrician ensures the installation adheres to all Verband der Elektrotechnik (Association for Electrical, Electronic & Information Technologies) standards and codes. This process guarantees that the new high-load circuit for charging your car will not compromise the existing electrical infrastructure of your home or the neighborhood.

The Grid Operator’s Role in Your Installation

The local grid operator plays a crucial supervisory role in the installation of your зарядная станция. They must be informed about every new charging point to manage grid load effectively.

Mandatory Registration

Every wallbox, regardless of its power output, must be registered with the local grid operator before it is commissioned. Your certified electrician handles this paperwork, known as the registration. This registration informs the operator of a new, significant load on their network, which is essential for planning and stability. This step is mandatory for all charging equipment.

Approval for Chargers Above 11 kW

If your charging station has a capacity greater than 11 kW, you need more than just registration. You must obtain prior approval from the grid operator.

Важное замечание: The operator can deny the request if they determine the local grid cannot support the additional load from the powerful charging. This prevents blackouts in your area. Your electrician will assess this possibility during the initial consultation.

Why Grid Stability Matters

Imagine an entire street of residents plugging in their electric car for charging at 6 p.m. Without grid management, this sudden surge in demand could overload local transformers and cause power outages. Registration and approval processes allow grid operators to monitor and manage these loads, ensuring a reliable electric supply for the entire community. This is a critical aspect of responsible charging at home.

Legal Consequences of Non-Compliance

Ignoring the law and attempting a DIY installation exposes a homeowner to severe legal and financial risks. The consequences go far beyond a simple warning.

Fines and Financial Penalties

Grid operators can impose significant fines on homeowners for uncertified and unregistered installations. These penalties are designed to discourage illegal electrical work that endangers public infrastructure. The cost of the fine often exceeds any perceived savings from a DIY job.

Risk of Forced Grid Disconnection

If an illegal installation is discovered, the grid operator has the authority to disconnect the property from the power grid immediately. They will only restore power after a certified electrician has inspected, corrected, and properly registered the system, adding significant cost and inconvenience. This protects the grid from the dangers of improper charging.

Personal Liability in Case of Accidents

This is the most serious risk. If an uncertified installation causes a fire, damages property, or injures a person, the homeowner is held fully liable. Insurance will not cover the damages. The homeowner faces immense financial responsibility and potential criminal charges, especially in cases of negligence leading to harm. The safety of your family and your car depends on following the correct procedures for electric car charging.

DIY vs. Professional Installation: A Safety Comparison

The legal mandate for professional installation exists for one primary reason: safety. The debate of diy vs. professional installation is not about skill, but about mitigating extreme dangers. High-power electric car charging systems introduce significant electrical hazards into a home environment. Understanding these specific risks clarifies why German law prohibits unqualified individuals from performing this work.

The Critical Dangers of DIY Electrical Work

Working with your home’s electrical system is inherently dangerous. A wallbox installation elevates these dangers to a life-threatening level. These are critical safety considerations.

Working with 400V Three-Phase Power

Most German homes have access to 400-volt three-phase power. This is the standard supply for high-power charging. This voltage is substantially higher and more dangerous than the typical 230-volt single-phase power found in wall outlets. An amateur lacks the training and specialized equipment to handle 400V systems safely. A single mistake can have catastrophic consequences.

Life-Threatening Electric Shock Risks

Contact with a live 400V circuit can be instantly fatal. The high voltage can cause severe burns, cardiac arrest, and other fatal injuries. A professional electrician understands lockout/tagout procedures, uses insulated tools, and employs voltage testers to ensure a circuit is de-energized before beginning work. These safety protocols are non-negotiable.

Understanding Arc Flash Hazards

An arc flash is a violent electrical explosion that occurs when a current leaves its intended path. It can be triggered by a dropped tool or a loose connection.

An arc flash releases a blinding light, intense heat (up to 20,000°C), and a powerful pressure wave. It can cause fatal burns, vaporize metal, and create a deadly shrapnel effect. These electrical hazards are a serious risk during a DIY installation.

Fire and Short Circuit Hazards

Improper installation is a leading cause of electrical fire. A charging station places a continuous, heavy load on a circuit for hours at a time, exposing any weakness in the installation. These hazards threaten the entire home.

Dangers of Incorrect Wire Sizing

Choosing a wire gauge that is too small for the amperage of the charging circuit is a classic DIY error. An undersized wire will overheat under the sustained load of charging a car. This heat melts the wire’s insulation, creating a severe fire risk inside your walls. Professionals use specific calculations to select the correct cable, ensuring maximum safety.

Improper Circuit Breaker Selection

A circuit breaker must be perfectly matched to the wire size and the load. An incorrectly sized breaker may fail to trip during an overload or short circuit. This failure allows excessive current to flow, leading to overheating and fire. A professional ensures the breaker provides reliable protection for the new charging circuit.

Важность правильного заземления

A proper ground connection is a critical safety feature. It provides a safe path for fault currents to travel, causing the circuit breaker to trip. Without a reliable ground, the metal casing of the wallbox or even the car itself could become energized during a fault, creating a lethal shock hazard.

Damage to Your Property and Vehicle

The financial risks of a failed DIY installation extend beyond fines and legal liability. The potential for physical damage to your most valuable assets is immense. This is a key point in the diy vs. professional installation discussion.

Overloading Your Home’s Electrical System

A home electrical panel has a finite capacity. Adding a high-power charging circuit without a proper load calculation can overload the entire system. This can cause frequent breaker trips, damage other appliances, and create widespread electrical hazards. An electrician assesses the home’s total load to prevent this.

Damaging Your EV’s Battery and Electronics

Your electric car is a sophisticated piece of technology. Its battery and charging systems are sensitive to power quality. An improperly installed charger can deliver unstable power to your car. This can lead to significant problems.

  • Trigger error codes: Irregular power flow from a malfunctioning charging setup can cause the car’s battery management system to generate persistent error codes.
  • Battery wear: Over time, persistent power surges or grounding issues from a faulty charging connection can contribute to the premature degradation of the EV’s battery.

Even advanced EV charging solutions from providers like TPSON require correct installation to protect the car.

Ruining the Wallbox Unit Itself

Incorrect wiring, improper voltage connections, or a short circuit can instantly destroy the internal electronics of the charging station. A brand-new wallbox can become an expensive piece of plastic before its first charging session. This negates any perceived cost savings and adds replacement costs to the list of safety considerations.

Financial Fallout: Insurance, Warranties, and Subsidies

The legal and safety issues of a DIY installation create significant financial risks. A homeowner who sidesteps professional installation for their car charging setup faces a cascade of negative consequences. These include voided insurance policies, lost product warranties, and ineligibility for government incentives. The perceived savings from a DIY job quickly disappear when these financial realities emerge.

Voiding Your Home and Fire Insurance

A homeowner’s insurance policy is a contract based on maintaining a safe and compliant property. An illegal electrical installation breaks this contract.

The “Uncertified Installation” Clause

Nearly all home insurance policies in Germany contain clauses that invalidate coverage for damages caused by uncertified or non-compliant electrical work. An uncertified wallbox installation falls directly into this category. The insurer has no obligation to cover losses stemming from such a breach of policy terms.

Full Liability for Fire and Property Damage

If an improperly installed charging station causes a fire, the homeowner bears 100% of the financial liability. This includes the cost to repair their own home, replace their car, and cover any damage to neighboring properties. The financial devastation can be life-altering.

How Insurers Deny Claims

Insurers will investigate the cause of any electrical fire. Upon discovering an uncertified charging installation, the claims process is straightforward for them.

The insurer will point to the policy’s exclusion clause for non-compliant work. They will deny the claim, leaving the homeowner responsible for all costs. The illegal installation provides clear grounds for claim denial.

Losing Product and Vehicle Warranties

Warranties from manufacturers are contingent on the proper use and installation of their products. A DIY installation violates these conditions for both the charging station and the electric car.

Wallbox Manufacturer Warranty Conditions

Wallbox manufacturers, including providers of advanced EV charging solutions like TPSON, require installation by a certified electrician. Their warranties do not cover damage resulting from improper installation. A DIY error that damages the unit means the owner must pay for a replacement out of pocket. Following manufacturer guidelines is essential for warranty protection.

Electric Vehicle Warranty Exclusions

Electric car manufacturers are very specific about charging. Their warranties protect against manufacturing defects, not damage from external sources. A faulty DIY charging setup can cause serious damage to a car’s sensitive electronics. Warranty policies explicitly exclude coverage for such issues. Common exclusions include:

Proving Fault After an Electrical Incident

After an electrical incident involving the car, the manufacturer will investigate the charging source. If they find a non-compliant home charging installation, they will attribute the fault to the improper setup. This makes it nearly impossible for the owner to make a successful warranty claim for the damaged car.

Forfeiting Government Subsidies

Government incentives for home charging infrastructure are designed to promote safe and grid-friendly installations. DIY projects do not qualify.

The KfW Subsidy’s Historical Requirement

Germany’s popular KfW 440 subsidy program serves as a key example. To receive the funds, homeowners had to submit the final invoice from the certified electrical contractor who performed the installation. This was a non-negotiable requirement.

Why Proof of Professional Work is Needed

Subsidy programs require proof of professional work to ensure taxpayer money supports safe, legal, and grid-compliant charging solutions. The government will not fund installations that pose a risk to public safety or grid stability. This protects the integrity of the incentive program.

Rules for Future Local and State Incentives

Any future subsidies for home charging from local or state authorities will almost certainly follow this model. They will require documentation from a certified professional. A homeowner choosing the DIY route automatically forfeits any chance of receiving financial support for their charging project.

The Professional Installation Process for EV Charging Safety

The Professional Installation Process for EV Charging Safety
DIY vs. Professional Installation for Your Home Charging Box: A German Safety Guide 5

A professional installation follows a structured process. This process guarantees compliance, performance, and above all, safety. Each step is critical for achieving reliable electric car charging at home. This approach ensures total EV charging safety от начала до конца.

Step 1: Finding a Certified Electrician

The first and most important step is selecting the right professional. This choice sets the foundation for a safe and legal installation.

What is an “registered electrical contracting company”?

. registered electrical contracting company is a registered electrical contracting company in Germany. These firms are listed in the local grid operator’s directory. This registration confirms they have the master craftsman qualifications and liability insurance required to work on a home electrical system. Their expertise is essential for EV charging safety.

How to Verify Credentials Online

Homeowners can verify a company’s status. They can check the official directory maintained by their local grid operator. This simple check provides peace of mind and confirms the installer is legally authorized to perform the work. This verification is a key part of ensuring safety.

Where to Find Qualified Installers

Qualified installers are available through several channels.

  • Local grid operators often provide lists of registered contractors.
  • Manufacturers of advanced charging equipment, like TPSON, may have networks of recommended installers.
  • Online trade portals dedicated to certified craftspeople are also a valuable resource for finding a professional.

Step 2: The On-Site Assessment

A certified electrician never provides a quote without first inspecting the property. This on-site assessment is crucial for planning a safe and efficient charging setup.

Оценка главного электрического щита

The electrician will examine the main electrical panel (fuse box). They assess its current load and available capacity. This evaluation determines if the existing system can handle the continuous power draw of electric car charging. This step is vital for the safety of the entire home.

Planning the Wiring Route

The professional plans the safest and most efficient route for the new electric cable. The path runs from the electrical panel to the desired wallbox location. They consider factors like wall materials and distance to minimize disruption and adhere to building codes. Proper planning prevents future problems with the charging system.

Assessing the Need for System Upgrades

The assessment may reveal the need for upgrades. This could include a new sub-panel, a higher-capacity main breaker, or even earthworks for the cable. Addressing these needs is fundamental to ev charging safety and prevents overloading the home’s electric infrastructure during car charging.

Step 3: Installation and Grid Registration

With a solid plan, the physical installation begins. This phase combines technical skill with administrative diligence for the charging equipment.

Mounting the Wallbox Securely

The electrician mounts the charging station to the wall. They use appropriate hardware for the surface material, whether it is brick, concrete, or drywall. A secure mounting prevents physical damage to the unit and ensures long-term safety. The car will depend on this stable charging connection.

Running Cable and Making Connections

The installer runs the dedicated, correctly sized cable from the panel to the wallbox. They make all electrical connections inside the panel and the charging unit. They follow strict Verband der Elektrotechnik (Association for Electrical, Electronic & Information Technologies) guidelines for every connection to ensure a flawless and safe charging circuit for the car. This is a critical moment for ev charging safety.

Submitting Paperwork to the Grid Operator

After the installation, the electrician completes and submits all necessary registration forms to the local grid operator. This formalizes the new charging point. This step makes the installation legally compliant and informs the utility of the new load from the car charging.

Step 4: Final Testing and Handover

The installation process concludes with a critical verification phase. The electrician’s job is not finished until they have proven the system is completely safe and compliant. This final step provides the homeowner with documented proof of a professional installation, which is the cornerstone of long-term ev charging safety. The handover formalizes the completion of the project and confirms the system is ready for its first charging session.

Adhering to Verband der Elektrotechnik (Association for Electrical, Electronic & Information Technologies) Standards and Protocols

A professional electrician rigorously follows the testing protocols defined by Verband der Elektrotechnik (Association for Electrical, Electronic & Information Technologies) standards. These technical regulations are the official rulebook for all electrical work in Germany. They specify the exact measurements and functional checks required to commission a new circuit. This adherence is not optional; it is a mandatory part of a legal installation. Following these protocols ensures that every aspect of the charging setup, from the panel to the plug, meets Germany’s highest safety benchmarks.

Performing Essential Safety Measurements

Before energizing the wallbox, the electrician uses specialized test equipment to perform a series of crucial safety measurements. These tests confirm the integrity of the installation and the proper function of its protective devices. Key tests include:

  • Insulation Resistance Test: This check ensures the cable’s insulation was not damaged during installation, preventing short circuits.
  • Continuity of Protective Conductors: This test verifies that the ground connection is solid, which is essential for protecting against electric shock.
  • RCD Function Test: The electrician manually trips the Residual Current Device (RCD) to confirm it disconnects the power instantly in a fault condition. This is a vital test for EV charging safety.
  • Voltage and Phase Rotation Check: This confirms the correct voltage is present and, for three-phase systems, that the phases are in the right order for safe charging.

These measurements provide objective data proving the system is safe for daily charging.

Receiving Your Installation Certificate

Upon successful completion of all tests, the electrician provides the homeowner with an official installation certificate or handover protocol. This document is your most important record.

This certificate is the official proof that your charging station was installed by a сертифицированный специалист in compliance with all legal and technical standards. It is essential for insurance, warranty, and liability purposes.

The document details the work performed and lists the results of the safety measurements. It confirms that even advanced EV charging solutions from providers like TPSON are installed correctly for optimal performance and EV charging safety. This certificate finalizes the process, giving you the confidence to begin charging your vehicle safely.

Key Safety Components in a Professional Installation

Key Safety Components in a Professional Installation
DIY vs. Professional Installation for Your Home Charging Box: A German Safety Guide 6

A professional installation goes beyond simply connecting wires. It involves integrating critical safety devices into your home’s electrical system. These components are mandated by German electrical codes and are non-negotiable for the safety of your family and property. They protect against electric shock and fire, which are primary safety considerations for any high-power appliance.

The Role of the Residual Current Device (RCD)

An RCD, or Residual Current Device, is a life-saving device. Its sole purpose is to protect people from dangerous electric shock. It constantly monitors the flow of electricity in a circuit.

RCD Type A for Basic Protection

A Type A RCD is a standard safety device in many household circuits. It provides robust protection against AC and pulsating DC fault currents. This level of protection is sufficient for most common home appliances. However, electric vehicle charging presents a unique challenge.

Why RCD Type B is Often Required for EVs

The electronics inside an electric car can sometimes produce a smooth DC fault current during a charging error. This type of current can render a standard Type A RCD ineffective, a phenomenon known as “blinding.”

A blinded RCD will not trip during a fault, creating a severe safety hazard. For this reason, electrical guidelines often require a Type B RCD for EV charging circuits. A Type B RCD detects all types of fault currents, including smooth DC, ensuring complete protection for your car.

  • Use a Type A RCD only when the зарядное оборудование includes certified 6mA DC fault detection. Advanced solutions, like those from TPSON, often integrate this feature.
  • Use a Type B RCD if the charger lacks this internal detection or if the manufacturer explicitly requires it for maximum safety.

How an RCD Prevents Electric Shock

An RCD works by detecting tiny imbalances between the outgoing and returning current in a circuit. If a person touches a live component, some current flows through their body to the ground. The RCD detects this imbalance and cuts the power in a fraction of a second. This rapid disconnection happens before the shock can become fatal, making it a crucial safety feature when handling your car’s charging cable.

Miniature Circuit Breakers (MCBs)

An MCB, or Miniature Circuit Breaker, protects the installation itself. Its job is to prevent fires by guarding against overloads and short circuits in the charging circuit.

Preventing Overloads and Short Circuits

EV charging places a heavy, continuous load on a circuit for many hours. An MCB prevents the circuit’s wiring from overheating under this strain. It also trips instantly during a short circuit. This action stops a massive surge of current that could otherwise cause a fire in your home.

Selecting the Correct Amperage

An electrician selects an MCB with a specific amperage rating based on the charger’s power and the wire size. A breaker that is too small will trip needlessly, while one that is too large will not provide adequate safety. The calculation must account for the continuous nature of car charging.

Питание зарядного устройстваРекомендуемый размер выключателя
11 kW (3-phase)20 Amps
22 kW (3-phase)40 ампер

This precise matching ensures the system operates safely under full load.

Integration into the Fuse Box

The electrician installs the RCD and MCB together in the home’s main fuse box. They create a new, dedicated circuit exclusively for the charging equipment. This isolates the high-power charging system from the rest of your home’s wiring, ensuring reliable performance and comprehensive safety for your car.

Cost Analysis: The Myth of DIY Savings

Many homeowners consider a DIY installation to reduce the initial cost of home charging. However, a detailed cost analysis reveals that this approach often leads to greater expenses and unacceptable risks. The perceived savings are a myth when weighed against the true financial picture of installing a charging station for your car.

The Perceived “Savings” of DIY

The initial appeal of a DIY project is avoiding labor fees. This view overlooks several critical financial factors that quickly erode any potential savings.

Tool and Raw Material Costs

A proper installation requires specialized tools that most homeowners do not own. The cost of purchasing voltage testers, torque screwdrivers, and cable strippers adds up. Additionally, buying professional-grade cables, conduits, and breakers at retail prices is often more expensive than what a contractor pays at wholesale. This initial material cost can be surprisingly high.

The Hidden Cost of Your Time and Effort

A homeowner’s time has value. Researching Verband der Elektrotechnik (Association for Electrical, Electronic & Information Technologies) standards, planning the installation, and performing the physical labor can take dozens of hours. This significant time investment is a hidden cost. A professional completes the job efficiently, freeing the homeowner from a complex and time-consuming task.

The Incalculable Financial Cost of Risk

The greatest hidden cost is risk. A DIY error can lead to a house fire or a damaged car. The financial cost of such a disaster is immeasurable. This potential for catastrophic loss makes the financial risk of DIY charging installation an unacceptable gamble for any home.

Understanding a Professional Quote

A professional quote provides a transparent breakdown of the total cost. This clarity helps homeowners understand exactly what they are paying for.

Breakdown of Labor Costs

The labor cost covers the electrician’s expertise, time, and certified work. This fee ensures the installation meets all legal and safety standards. It is the cost of guaranteed compliance for your home charging setup.

Material Costs for Cables and Breakers

A professional quote includes the cost of all necessary materials. This includes the correctly sized cable, the required RCD and MCB, and all mounting hardware. Contractors often source high-quality materials at a better price, passing some of that cost efficiency to the customer.

Fees for Registration and Certification

The quote also includes the administrative cost for managing paperwork. The electrician handles the mandatory registration of the charging station with the grid operator. This fee covers the cost of ensuring your car charging system is legally documented.

The Long-Term Value of Professional Work

The upfront cost of a professional installation is an investment in long-term value and security. This initial cost pays dividends over the life of the charging system.

Guaranteed Safety and Compliance

A professional installation guarantees safety. It ensures the charging system for your car is compliant with all German laws. This eliminates the risk of fines, grid disconnection, and liability in case of an accident. The cost of professional work is the cost of security.

Preserving Your Property’s Value

A certified, legally installed charging station can increase a property’s value. It is an attractive feature for future buyers. An illegal DIY installation, however, can be a liability that devalues a home. The cost of professional work protects your investment.

Achieving Total Peace of Mind

Ultimately, the value of a professional installation is peace of mind. Knowing your family, home, and car are protected by a safe and reliable charging system is priceless. This confidence is the true return on the cost of a certified installation.


The diy vs. professional installation debate in Germany ends with a clear legal and safety mandate for your home. Attempting to install charging equipment yourself is illegal and introduces severe risks. The choice for safe electric car charging is straightforward.

  • Legal Compliance: A professional installation of your wallbox is the only legal path for домашняя зарядка, ensuring total ev charging safety.
  • Risk Mitigation: This approach eliminates the severe safety risks, protecting your car from damage during charging.
  • Guaranteed Safety: This commitment to safety protects your car during every charging session and ensures the charging equipment provides long-term ev charging safety.

Ultimately, choosing a professional for charging at home guarantees ev charging safety for your car and home, making the diy vs. professional installation choice simple.

ЧАСТО ЗАДАВАЕМЫЕ ВОПРОСЫ

Can I install a wallbox myself if I have electrical experience?

No. German law (NAV § 13) mandates that only a registered electrical contractor can perform the installation. This rule applies to everyone, regardless of personal experience. A certified professional ensures the work is safe and compliant.

What happens if I do not register my wallbox?

The grid operator can impose large fines for an unregistered installation. They also have the authority to disconnect the property from the power grid. This action protects public infrastructure from uncertified electrical loads.

How long does a professional installation take?

A standard installation typically takes a few hours. The electrician first conducts an on-site assessment. The actual installation at your home is usually completed within one day, ensuring minimal disruption.

Do I need a specific RCD for my car?

Yes, EV charging requires specific protection.

A Type B RCD is often necessary to protect against DC fault currents from the car. Some advanced chargers, like those from TPSON, have built-in DC fault detection, allowing the use of a Type A RCD.

Can I use a portable charger instead of a wallbox?

A портативное зарядное устройство offers flexibility for a car. It plugs into a standard household socket. However, it provides much slower charging speeds. A permanently installed wallbox at home offers faster, safer, and more convenient daily charging for your car.

Why must the grid operator approve a 22 kW charger?

A 22 kW charger places a very high demand on the local grid. The approval process allows the operator to confirm the network can handle the extra load from your car. This prevents power outages and ensures grid stability for the entire community. This is a critical step for high-power car charging at home.

О нас
Изображение TPSON
TPSON

Нашими целями в компании TPSON являются безопасность, эффективность и устойчивое развитие энергетики. Мы разрабатываем передовые технологии в области энергетических решений и интеллектуальных электрических систем.

Свяжитесь с нами

Интересуют наши решения для зарядки EV? Свяжитесь с нашей командой для получения дополнительной информации:
info@tpsonpower.com

ИЛИ